Adam Partee
07/29/2025, 4:25 PMCeligo AI
07/29/2025, 4:25 PMAI generated answer (using internal Slack threads):****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ****** To prevent a sales order line from being included in MRP (Material Requirements Planning), you can set the Replenishment Method to 'Reorder Point' on the item record. This will ensure that the item is not considered in MRP calculations. Here's a step-by-step guide on how to do this: 1. Navigate to the item record that you want to exclude from MRP. 2. Go to the 'Inventory' subtab. 3. In the 'Replenishment' section, set the 'Replenishment Method' to 'Reorder Point'. 4. Save the changes. Additionally, if you have a custom status field on the item record and you want to automatically set the Replenishment Method to 'Reorder Point' when this status changes, you can use a workflow to achieve this. Please note that this solution assumes that you have the necessary permissions to modify item records and create workflows in your NetSuite account.
Celigo AI
07/29/2025, 4:25 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.794555306
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.786818564
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.78426218
Celigo AI
07/29/2025, 4:25 PM