Thanks for replying @Bryan Miller This is kind of what I was afraid of. I assume our setup would not be that case, when it runs well, it is about 15 to 20 minutes, same parameters every execution. 5 locations, total of 450 finished goods, not all items at each location. we manufacture at 1 location (380 of 450 items are assemblies); transfer and purchase into the other 4 locations.