Hi All,
For allocation, is there any internal way to tell the system to allocated based on a custom field in an SO? So we have a CRD (Customer requested date) that we want to allocate materials to but by default the system allocates based on date created.
So we may have an SO in the system that doesn’t need to be built until July but we put in the system now vs another SO that we ‘rush’ that is put in and needs to be built sooner.
Has anyone dealt with changing the logic inside netsuite or is this some type of MFG module that we need to get to do that?