Hello, got a question regarding COGS:
I built two work orders of the same assembly item. Both with quantity 10, but with different projected value (the second work order was a bit more expensive). Then i created a Sales order with quantity 15. The assembly item have "Costing Method" = "FIFO". In my mind when placing a Sales order with quantity 15, the COGS should be the complete value of build 1 (quantity 10) + half of the value of build two (quantity 5). But when i look in to the GL-impact on the item fulfillment the COGS = 15 x average cost. How is this possible when the item is set to FIFO?