Join Slack
Powered by
<@U9JL1HCMC> what do you want to do different beyo...
# inventory
j
jokell
03/26/2018, 9:01 PM
@zengs
what do you want to do different beyond the landed cost options already in there? As long as the bill is linked to the purchase order the landed cost can be calculated per line by either weight or value.
Open in Slack
Previous
Next