Adam Weaver
05/15/2026, 5:16 PMCeligo AI
05/15/2026, 5:16 PMAI generated answer (using internal Slack threads):When you change WIP (Work in Progress) and routing work centers and cost templates, it will not adjust everything back. The changes will only apply to future work orders. NetSuite's manufacturing module is designed to work with static routings. This means that once a work order is created, the routing, work center, and cost template associated with that work order cannot be changed. If you need to change the work center or cost template for a specific operation within a work order, you would need to create a new work order with the desired settings. However, there are workarounds to this limitation. One suggested workaround is to create a routing step for each work center within the same routing record. Another workaround is to create a non-inventory item that impacts your indirect labor account and add that to your BOM for the assembly. Then during the Work Order Completion, the user would add the quantity of the extra cost. Remember, these changes will not affect existing work orders or transactions. They will only apply to future work orders and transactions. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
05/15/2026, 5:16 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.829284728
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.819824338
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.813232481
Celigo AI
05/15/2026, 5:16 PM