has there been any kind of remedy or work around f...
# ask-stanley-ai
a
has there been any kind of remedy or work around for scrapping out components from a WIP work order completion
c
AI generated answer (using internal Slack threads):
Based on the conversations, it appears that there isn't a direct way to reverse a component issue on a work order in NetSuite. However, one suggestion was to consider deleting the work order issue if it's in an open period. This might help to pull the component back from WIP to raw material. In terms of scrapping out components from a WIP work order completion, it seems that NetSuite's standard MRP behavior automatically recognizes supply as it is constructed. If you want finished goods only when they are completed, you could use work order (WO) completion rules (supply type = "Upon Completion") or modify item/WO settings. However, it's important to note that NetSuite lacks discrete timing granularity by default, so most people manage it with configuration and planning changes. Unfortunately, the exact location of these settings wasn't specified in the conversations. It was mentioned that supply type is an option on the locations sublist, but the only options are build and purchase. It was also suggested that using WIP might be necessary to make this function correctly. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.831482
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.816162169
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.804748654
Please provide your feedback on this answer.