Renee
03/30/2026, 10:41 AMCeligo AI
03/30/2026, 10:42 AMAI generated answer (using internal Slack threads):Based on the conversations provided, the item type needed to rollup the toll charge into the cost of the item when using standard costing is either Service for Purchase or Other Charge for Purchase. These item types are used in the Bill of Materials (BOM) for outsourced manufacturing. However, it's important to note that using these item types may lead to issues with direct and non-direct revenue posting, as mentioned in the conversation. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
03/30/2026, 10:42 AMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.824890196
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.815307498
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.811584473
Celigo AI
03/30/2026, 10:42 AMCeligo AI
03/30/2026, 10:43 AM