A couple of things. On work orders, a script which looks at the batch size, figures out which scale can be used to weigh out materials, and does units of measure conversion and rounding within a tolerated variance of quantity to consume. For example, when 100 pounds or more are called for, a heavy duty scale having 1-pound precision can be used. But a small lab batch of the same product is converted to grams and the amount called for will be expressed as grams and fractions of a gram. These numbers are printed on the work order traveler for the batchmaker.
A what-if costing tool that puts a button on each item master record, explodes the bill of materials, and shows the future cost to manufacture, either from scratch (total cost) or based on current inventory on hand (gap cost), with the ability to override last cost with a future quoted cost on each component.