How to best track Component scrap on Work Orders
# ask-stanley-ai
m
How to best track Component scrap on Work Orders
c
AI generated answer (using internal Slack threads):
****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ****** To track component scrap on Work Orders in NetSuite, you can utilize the
scrapquantity
field on work orders. However, this field may not be directly searchable in filters or columns of a search. To access this field, you can use the
applying transaction
join to get to the related work order completion. Please note that there will be multiple related rows for the applying transaction, one of which represents the scrap quantity. The row that represents the scrap quantity will have the
Is Scrap
column set to true, and that row's quantity will represent the completion's scrap quantity. If a work order is no longer needed and you need to pull the component back from WIP to raw material, you might consider deleting the work order issue. This could be a viable solution if your Work Order issue is in an open period. However, this should be done with caution as it may have other implications on your financials and inventory management. Please note that these are general suggestions and the actual process may vary based on your specific business requirements and NetSuite setup. Always test any changes in a sandbox environment before applying them to your live account.
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.834716916
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.817688107
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.807678282
Please provide your feedback on this answer.