When is WIP moved to Finish Goods is it on STatus change to Built or when Work Order Completion shows Built qty greater than required qty
c
AI generated answer (using internal Slack threads):
In NetSuite, the Work in Process (WIP) is moved to Finished Goods when the status of the Work Order changes to 'Built'. This happens when the Work Order Completion is posted, indicating that the manufacturing process is complete. The quantity built does not necessarily have to be greater than the required quantity. It can be less or equal to the required quantity, depending on the actual production output. However, it's important to note that the WIP is only moved to Finished Goods if the ending operation in the routing is the last operation. If the ending operation is not the last operation, the quantity to build will copy the completed quantity field, but the WIP will not be moved to Finished Goods. Also, if you're using the 'Upon Completion' supply type, the finished goods will only be recognized when they are completed. This is a standard MRP behavior in NetSuite and can be managed with configuration and planning changes. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.84008795
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.832763731
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.824401915
Please provide your feedback on this answer.