What are the settings involved when setting automatically an end date on a work order in NetSuite?
c
AI generated answer (using internal Slack threads):
To automatically set an end date on a work order in NetSuite, you can use the manufacturing settings. There is a setting in manufacturing settings to set start/end date automatically based on work order lead times. This setting will automatically calculate the end date of a work order based on the lead times you have set for the work order. However, please note that the end date of a work order can have an impact on your inventory. The supply is automatically recognized as it is constructed, which is standard MRP behavior in NetSuite. If you want finished goods only when they are completed, you can use WO completion rules (supply type = "Upon Completion") or modify item/WO settings. If you want to bypass the end date field on work orders, you can create a workflow to auto-populate it with today's date or a date far in the future. However, be aware of any downstream issues this might cause. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.849426448
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.84033215
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.826049924
Please provide your feedback on this answer.