when releasing a schedule on a blanket purchase or...
# ask-stanley-ai
a
when releasing a schedule on a blanket purchase order i'm receiving the a notice which states: Please enter value(s) for: Assembly, Bill Of Materials, Bill Of Materials Revision what does this mean?
c
AI generated answer (using internal Slack threads):
The error message you're seeing is likely due to missing information in the Assembly, Bill Of Materials, and Bill Of Materials Revision fields. When you're releasing a schedule on a blanket purchase order, NetSuite requires these fields to be filled out. The Assembly field is where you specify the assembly item that you're ordering. The Bill Of Materials (BOM) field is where you specify the list of components that make up the assembly item. The BOM Revision field is where you specify the version of the BOM that you're using. If any of these fields are left blank, NetSuite will not allow you to release the schedule on the blanket purchase order and will show the error message you're seeing. To resolve this issue, you should ensure that you have correctly filled out these fields. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.819091797
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.800842404
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.800720215
Please provide your feedback on this answer.