Is there a setting in Netsuite to change Quantity for a Work Order even after there is an Assembly against it
c
AI generated answer (using internal Slack threads):
Based on the conversations provided, it appears that once a Work Order is completed and closed in NetSuite, you cannot edit or reduce the originally completed quantity on the Work Order record itself. However, if there is an overproduction, you can use the Assembly Unbuild function to reverse the production and put the raw material stock back. In terms of changing the quantity of a Work Order after an Assembly has been built against it, it seems that this is not directly possible. However, there are discussions about workarounds such as zeroing out the quantity of a line on the Work Order, which will carry over into the Assembly Build and allow the build to be completed. Please note that these are based on the discussions in the provided threads and may not cover all possible scenarios or NetSuite settings. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.85207361
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.85108012
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.84914422
Please provide your feedback on this answer.