JB
07/31/2025, 4:10 PMCeligo AI
07/31/2025, 4:10 PMAI generated answer (using internal Slack threads):Based on the conversations provided, it appears that the option to disable the Estimated Landed Cost in the Supply Chain Management (SCM) preference is not directly mentioned. However, there are discussions about the behavior of the "Landed Cost Per Line" option in Inbound Shipments and Item Receipts, which seems to be a related feature. In one thread, a user mentions that even with the "LANDED COST ALLOCATION PER LINE" preference unchecked, the "Landed Cost Per Line" box is still checked when receiving an Inbound Shipment. This behavior was confirmed by NetSuite Support as intended. In another thread, a user is trying to get rid of a warning message that appears when saving an Item Receipt with the "Landed cost per line" option checked. The warning message indicates that the "Calculate Est. Landed Cost" option is enabled for at least one of the items in the transaction. The user was informed that it's not possible to get rid of this dialogue according to an enhancement with ID 578728. From these discussions, it can be inferred that the "Landed Cost Per Line" and "Calculate Est. Landed Cost" options are related to the Estimated Landed Cost feature. However, there is no direct mention of a way to disable the Estimated Landed Cost in the SCM preference. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
07/31/2025, 4:11 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.812668204
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.80949527
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.803600192
Celigo AI
07/31/2025, 4:11 PM