Can anyone help me understand NS Lot numbered costing method? I thought the cost is specific per lot.
I'm using a Lot numbered item with Lot numbered costing method. I don't understand why IA95 is using 21.18 as its rate (average) where it should be 19.771, given that IA95 is using the same Lot number number as IA20.