break up a work order over several days
# ask-stanley-ai
m
break up a work order over several days
c
AI generated answer (using internal Slack threads):
In NetSuite, if you have a Work Order (WO) for 100 pieces and you want to divide it to produce 60 pieces on Monday, 10 on Tuesday, and 30 on Wednesday, you can do this by using the Assembly Build function. You can perform three separate builds over a span of days. However, NetSuite does not provide functionality to split an existing work order into sub-work orders. Please note that this process can break at any time and you should not be surprised when it does. It's also important to remember that when a sales order is put in for an assembly, it doesn't automatically break down the components. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.818892241
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.793741
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.792419493
Please provide your feedback on this answer.