HA
04/10/2025, 4:00 PMCeligo AI
04/10/2025, 4:00 PMAI generated answer (using internal Slack threads):The Work Center may not appear in the Manufacturing Mobile module due to a few reasons. One of the reasons could be related to the setup of the Work Center. The Work Center needs to be properly set up with both Machine resources and Labor resources (Lists/Relationship/Groups - Manufacturing Work Center flag set to true) and the manufacturing routing(s) with Setup time and run rate with that group assigned. Another reason could be related to the number of planned time entries for a Work Center. If a Work Center assigned to a Manufacturing Cost Template has more than 260 planned time entries, it may cause an error and prevent the Work Center from appearing in the Manufacturing Mobile module. In this case, you would need to reduce the estimated work or increase units for the resource to resolve the issue. Please note that these are potential reasons based on the provided Slack threads and there could be other factors involved that are not mentioned in these threads. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
04/10/2025, 4:00 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.787289739
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.783059657
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.782229781
Celigo AI
04/10/2025, 4:00 PM