HA
03/04/2025, 8:20 PMCeligo AI
03/04/2025, 8:21 PMAI generated answer (using internal Slack threads):Based on the conversations, it appears that the rates of the costing templates cannot be overridden during the work order completion. The costing templates are designed to handle Labor Run, Labor Setup, Machine Run, and Machine Setup. These are built out at the routing sequence level. Therefore, any changes to these rates would need to be made at the template level, not during the work order completion. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
03/04/2025, 8:21 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.810942709
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.806161463
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.803234041
Celigo AI
03/04/2025, 8:21 PM