does the WIP process don't work on serialized item...
# ask-stanley-ai
h
does the WIP process don't work on serialized items with specific costing method
c
AI generated answer (using internal Slack threads):
Based on the conversations provided, it appears that the Work in Progress (WIP) process is not compatible with certain costing methods. Specifically, one user mentioned that WIP/Routings isn't compatible with the FIFO (First In, First Out) costing method. However, there is no direct mention of the WIP process not working with serialized items with a specific costing method. The conversations do discuss the complexities and challenges of using serialized and lot numbered items, but they do not explicitly state that the WIP process doesn't work with these items. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.817286134
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.811518371
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.806424439
Please provide your feedback on this answer.