why would me WIP account change so much when every...
# general
a
why would me WIP account change so much when everything else stayed the same? I edited the ASSYB# material/labor
s
any operational cost you added?
a
I don't believe so and the timestamp on these changes at at 9pm at night so kind of odd. I may have fat fingered how many pieces in assembly build and then fixed it but don't see that edit anywhere
s
you can see line level history at the work order line level history option
a
where would I navigate for this option?
m
9pm time stamp screams netsuite cost engine.
👀 1
1
✔️ 1
a
sorry I'm still learning this ERP system, can you explain a little more for me?
m
Go to Setup > Accounting > Inventory Costing Preferences:
You have that scheduled start time at 9pm?
a
it says 6pm. There were a few Old Value New Value links to click and they are changing amounts on RAW materials and then the last impact change was in the WIP account $2,849.97 to $383.03
m
The only thing that changes that after the fact is the costing engine.
a
so we are implementing WIP and Routing and its in our Sandbox now, is there anyway my Netsuite team could be starting to take steps in our Production side?
s
6pm server time my likely be 9:00pm local.
🫡 1
thankyou 1
a
my assembly form has also switched to dropdown menus for these two fields that was not like this earlier
s
Can you look at the history of the form? This does not sound like an upgrade issue. It sounds like someone change a setting on the form or a Workflow.
a
click to customize form and history should be there?
I was the last one to change it on 2/3 but I was just trying to add a field
it was fine last week thats forsure