HA
12/11/2024, 1:13 PMCeligo AI
12/11/2024, 1:13 PMAI generated answer (using internal Slack threads):To add more items to an existing bill of material revision via CSV, you should use the "update" type of import. This is because the bill of material revision already exists and you are just adding more items to it. When preparing your CSV file, make sure to use the Line ID to specify which lines you're editing versus adding. This will help NetSuite understand that you are updating an existing record rather than creating a new one. Remember, even though you are adding new items, this operation is still considered an "update" because the bill of material revision already exists. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
12/11/2024, 1:13 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.830227375
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.828413486
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.820647359
Celigo AI
12/11/2024, 1:13 PM