sdp126
11/20/2024, 9:39 PMCeligo AI
11/20/2024, 9:40 PMAI generated answer (using internal Slack threads):Based on the conversations, it seems that NetSuite's Material Requirements Planning (MRP) module is designed to handle a single flow from a source location to a destination location. However, there are a few potential workarounds you could consider: 1. Use Transfer Orders: You could use the Sales Order (SO) demands in the demand locations to generate planned Transfer Orders (TOs). These TOs would then be demands from the perspective of the centralized purchasing location, which could then be used for supply planning. 2. Use Reorder Point Method: If you set the Replenishment Method to Reorder Point, it will not be considered in MRP. This could potentially allow you to manage multiple source locations. 3. Use Workflows: You could potentially use a workflow to set a custom field when your status is changed. This could allow you to manage the flow of items from multiple source locations to a single destination location. Remember, these are just potential workarounds and may not work perfectly for your specific situation. You may need to experiment with these methods and adjust them to fit your needs. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Celigo AI
11/20/2024, 9:40 PMSlack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.837151945
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.820566654
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.815622926
Celigo AI
11/20/2024, 9:40 PM