how can the work order lead time auto-calculate
# ask-stanley-ai
h
how can the work order lead time auto-calculate
c
AI generated answer (using internal Slack threads):
The work order lead time can be auto-calculated in NetSuite by enabling the Time Phased planning for an item. However, if you want to manually enter a value for Lead Time, you need to uncheck the Auto-Calculate checkbox and then go to the location Sublist to find the lead time field. For custom functionality to calculate lead times for current open sales orders or future sales orders based on your own capacity, you might consider creating a popup suitelet on each Sales Order page that triggers a few searches and then calculates the result into ATP (Available to Promise) dates. When calculating lead time, you might want to consider variables such as production capacity, on-hand stock, and current demand from sales orders. However, it's important to note that the system calculates lead time based on previous orders/receipts, regardless of your current inventory. This means that even if you have plenty of inventory for a high-moving item with a significant lead time, the system might still calculate its lead time as being quite long. ****** Disclaimer: This response was generated by an artificial intelligence assistant based on previous conversations from multiple Slack channels, and may contain inaccuracies or mistakes. ******
Slack thread 1: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.818212867
Slack thread 2: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.8163746
Slack thread 3: here (available only if the original thread was posted in the last 90 days)
Similarity score: 0.812630594