I'm running into an issue where I am pulling a LOT...
# general
a
I'm running into an issue where I am pulling a LOT into an assembly but there is another LOT in the same bin that is negative. When trying to pull the quantity of the new LOT that has the correct amount to pull I'm getting an error I can't pull because there is a negative number in the LOT. Do I need to zero out the negative LOT to pull the correct LOT I need?