does anyone have experience using the MRP with a single receiving warehouse and two different manufacturing sites. We receive all raw materials into a single warehouse and then transfer them to one of two different manufacturing sites based on what we are building. The finished goods from both manufacturing sites then get transferred to a unified shipping warehouse. I have the MRP working great for a single flow manufacturing site but am struggling to understand how to set it up for the scenario described. Any thoughts would be appreciated.